24 Hours  HK: +852 2521 0373   SGP: +65 6535 1661    PRC: 4000 1988 12
ALCO_HD

Official notices

Illustrative examples of real projects

Information on goods being shipped

Information about local area

Standardized template for communication

Different P&I rules at a glance

The library of Hull clauses

Insurance for Vessels

Details of the Charterer

Singapore

singapore_b

Singapore reminder on new bulk carrier requirements

New requirements for bulk carriers come into effect from July 1, 2004.

The requirements apply to new and existing (pre-July 1, 2004-built) bulkers. They stipulate that bulk carriers have to be fitted with water-level detectors. They also specify that bulk carriers must have the means to drain and pump ballast tanks forward of the collision bulkhead, as well as bilges of dry spaces, any part of which extends forward of the foremost cargo hold.

These pumping arrangements must be capable of operation from a readily accessible enclosed space, the location of which is accessible from the navigation bridge or propulsion machinery control position without traversing exposed freeboard or superstructure decks.

The regulations have to be complied with by specified dates relating to the vessels’ annual, intermediate or renewal surveys. The Singapore Maritime Port Authority has urged owners and operators of bulk carriers to procure water-level detectors and to plan for compliance with the new regulations well ahead of the scheduled deadlines as “supply of water-level detectors and installation facilities may not be able to meet demand when the regulations come into effect.”

(www.mpa.gov.sg)

Source : The London Stoploss Bulletin
02 Jun 2004

Follow and Contact Us

Follow and Contact Us