The reduction of the draft restrictions for Panama Canal has been suspended. Therefore, and until further notice, vessels will continue to be allowed to transit at their maximum Panama Canal approved draft up to 12.04 meters (39.5 feet) TFW. The second draft restriction up to 38.5 feet, scheduled for 15 September 2015, has been postponed due to the recent rain in the area.

 

巴拿马运河新吃水线暂缓执行

巴拿马运河降低吃水限制措施暂缓执行。在有进一步消息前,船舶允许通过的最大吃水仍为热带淡水12.04米(39.5英尺)。由于该地区近期雨水增多,原定于2015年9月15日实施,最大吃水38.5英尺的第二步限制计划也将推迟执行。