24 Hours  HK: +852 2521 0373   SGP: +65 6535 1661    PRC: 4000 1988 12
ALCO_HD

Official notices

Illustrative examples of real projects

Information on goods being shipped

Information about local area

Standardized template for communication

Different P&I rules at a glance

The library of Hull clauses

Insurance for Vessels

Details of the Charterer

New Draft Restrictions, Panama Canal

  • Home  
  • New Draft Restrictions, Panama Canal

 pdf ENG   pdf CHN  pdf Advisory to Shipping No.A-24-2015  pdf 航运公告第A-24-2015号 

New draft restrictions for Panama Canal will be effective from 8 September 2015.

The maximum permitted transit draft for the Panama Canal is set to 11.89 meters (39.0 feet) Tropical Fresh Water (TFW).

Vessels loaded prior 11 August 2015 may be allowed to transit with a TFW draft of up to 12.04 meters (39.5 feet), subject to safety considerations. Vessels loaded on or after 11 August 2015, must comply with the new restriction and may be required to trim or offload cargo, depending on the actual level of Gatun Lake at the time of the transit. If the lake level allows the transit of vessels at a draft deeper than announced, they will be allowed to transit despite not complying with the loading deadline.

See attached file: New Draft Restrictions, Panama Canal.pdf

 

巴拿马运河新吃水线

自2015年9月8日起巴拿马运河将开始实施新吃水线。

巴拿马运河允许通过的最大吃水为热带淡水11.89米(39.0英尺)。

2015年8月11日前装船的船舶,如安全考虑许可,在吃水不超过热带淡水12.04米(39.5英尺)时可允许通过。2015年8月11日当天或之后装船的船舶须遵守新吃水线规定,并视过河时加通湖的实际水位调整或卸除货物。当加通湖水位允许船舶在大于规定水位线的情况下过河,则不管是否符合前述装船期限的规定,均可通过。

详细信息请参阅附件。


Follow and Contact Us

Follow and Contact Us